China’s contractor has completed the pipeline-laying work for the first phase of the RUYA project. On February 26, Offshore Oil Engineering Co., Ltd. (referred to as OOE) announced that the vessel \"Offshore Oil 201\" had successfully finished all the pipeline-laying tasks for the first phase of the NOC RUYA EPCI09 contract project (referred to as the RUYA project) in Qatar. It is reported that the contract value for the RUYA project exceeds 1 billion US dollars, making it the largest offshore pipeline laying project undertaken by a Chinese company to date. The project site is the Al-Shaheen oil field, one of the largest and most complex oil fields in the world. The project scope includes the project management, detailed design, procurement, construction, transportation, installation, pre-commissioning, and related activities for 41 subsea pipelines and 9 composite subsea cables in that oil field area.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2038 to 2025, Dongfang Boiler managed to achieve stable coal-ammonia combustion operation for 100 consecutive hours. https://bbs.hcbbs.com/thread-5709786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Hachuan Chemical Industry Forum (HCHBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
【HaiChuan Chemical Technology Documentation】Analysis of the Causes of Overtemperature in the Air Preheating Coils of a Shift Converter Process and Corresponding Countermeasures https://bbs.hcbbs.com/thread-5709677-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Hachuan Chemical Industry Forum (HCHBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contes furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first fully domestically produced 300-megawatt class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2929 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))