HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The wastewater treatment project for Fujian Zhongsha Petrochemical’s 1.5 million tons per year ethylene production and downstream processing operations was successfully completed

2026-01-05View Original

Thread Content

On December 31, 2025, the wastewater treatment project for an annual production capacity of 1.5 million tons of ethylene and related downstream processed products at Fujian Sino-Saudi Petrochemical, which was constructed by Sinopec Nanjing Engineering Installation Branch, was successfully completed, marking the full transition of the project from the construction phase to the production preparation phase. This is the largest wastewater treatment facility of its kind for integrated refining and chemical processing in China; once completed, it will play a vital role in ensuring the green, low-carbon, and sustainable development of Fujian Sino-Saudi Petrochemical. As a key public infrastructure facility for this plant, it includes three main systems for treating wastewater with high salt content, low salt content, and general wastewater, along with supporting facilities such as substation buildings, cabinet rooms, and utility tunnels. Since work began in April 2024, facing the challenges of a tight schedule and a large volume of work, the project team has adhered to scientific management practices, detailed the objectives for various stages and assigned responsibilities clearly, and established an efficient coordination mechanism. To address challenges such as interdisciplinary collaboration and incomplete equipment delivery, special task teams were established to implement daily scheduling and weekly reviews, ensuring that the project progresses according to the planned milestones.
Reply #22026-01-05
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】The ammonia and hydrogen storage system at Qinghai Asia Silicon Poly-Silicon Co., Ltd., a project supervised by Tianhua Institute from 2025 to 2035, was successfully commissioned in just one attempt. https://bbs.hcbbs.com/thread-5710544-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-06
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really amazing! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-08
【Ten Years of Rapid Development in Chemical Equipment】Sinopec’s fluidized-bed residue hydrogenation technology was applied for the first time in a million-ton-scale industrial plant from 2025 to 2957. https://bbs.hcbbs.com/thread-5710591-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-08
【Ten Years of Rapid Development in Chemical Processing Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders monitored in real time; the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: HCHBBS Forum)
Reply #72026-01-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2959-2026 **Successful development of technology for keeping natural gas compressors running without power interruption in pipeline systems** https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The Phase I project for zero discharge treatment of high-salinity wastewater containing heavy metals such as nickel and cobalt at Jinchuan was put into operation. https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #92026-01-10
【Ten Years of Rapid Development in Chemical Processing Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.