The main structure of the gasification unit for the Shandong Hualu Hengsheng PtyH project has been successfully completed

2026-01-09View Original

Thread Content

Recently, the main structure of the gasification unit for the Shandong Hualu Hengsheng PTYH project, constructed by the Shandong branch of China National Chemical Engineering Third Construction Co., Ltd., was successfully completed one month ahead of the scheduled timeline, which earned high praise and gratitude from the project owner, Shandong Hualu Hengsheng Chemical Co., Ltd. The Shandong branch was responsible for the installation of the core structures for this project, including the gasification unit, ash water treatment systems, and filter press buildings. Among them, the gasification unit, as the core facility of the project, adopts a reinforced concrete frame structure; it has 8 floors above ground, a height of 50 meters, axial dimensions of 63 meters × 43 meters, and a building area of approximately 21,600 square meters. Since work began on September 17, 2025, the Shandong branch has worked in tandem with the Third Jian’an Engineering Company to overcome adverse weather conditions such as severe cold and snow. By formulating detailed work plans, taking proactive actions to address challenges, and ensuring 24/7 construction efforts, they carried out work day and night while actively coordinating various resources to solve technical problems. It took 100 days to complete the construction of the main structure, setting a new record for the speed of building such facilities. This demonstrates the excellent capabilities of Sanhua Jian in terms of professionalism, efficiency, willingness to take on tough tasks, and success in completing them. Not only did this create favorable conditions for subsequent equipment installation and system testing, but it also earned high praise from the client and supervision team due to the high quality of the work, thus enhancing the company’s reputation.
Reply #22026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The Phase I project for zero discharge treatment of high-salinity wastewater containing heavy metals such as nickel and cobalt at Jinchuan was put into operation. https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)
Reply #32026-01-10
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? The people I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-01-10
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? The people I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-01-10
【Ten Years of Rapid Development in Chemical Engineering Equipment】2962-2025: Tianyuan Company’s first domestic experimental unit for semi-coke in Shenmu coal chemical industry has been successfully put into operation https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-10
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-01-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-11
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-01-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-01-13
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluation from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-01-14
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site evaluation from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.