Reclamation project for the integrated refining and chemical complex of Dalian Petrochemical Branch of China National Petroleum Corporation (Xizhongdao)
Thread Content
Project Name: Reclamation Project for the Petrochemical Integration Project of Dalian Petrochemical Branch of China National Petroleum Corporation (Xizhongdao)Nature of the Project: New construction
Location: Xizhongdao Petrochemical Industrial Park, Changxing Island Economic and Technological Development Zone, Dalian
Scope of Construction: The reclamation area for this project is approximately 593 hectares; the construction work involves reclamation activities only, and it does not include the construction of land-based facilities after the land has been formed, nor does it cover the operations of the petrochemical integration project. On January 13, the public notice regarding the use of marine resources for the refining and chemical integration project of China National Petroleum Corporation’s Dalian Petrochemical Branch (Xizhongdao) was released. Project name for land use at sea: Integrated refining and chemical processing project of Dalian Petrochemical Branch of China National Petroleum Corporation (Xizhongdao). Applicant’s name: Dalian Petrochemical Branch of China National Petroleum and Natural Gas Corporation. Applicant’s address: No. 1, Shanzhong Street, Ganjingzi District, Dalian. Duration of land use permission: 50 years (with a construction period during which land use is permitted for 15 months). Location of land use at sea: Hulushan Bay, Dalian Changxing Island Economic and Technological Development Zone. Area of land used at sea: 750.8378 hectares. Type of land use: Industrial use. Methods of land use: Land reclamation through construction, construction of permeable structures, harbors, water storage facilities, dedicated waterways, and anchorages. On the morning of December 3, 2025, a meeting was held to discuss the overall plan for the Dalian Petrochemical (Xizhongdao) Integrated refining and chemical processing project. The two sides had in-depth discussions on key issues related to project construction and core aspects of the site layout design, and conducted thorough deliberations on topics such as the delineation of the project’s boundary lines, the optimization of surrounding infrastructure planning, the layout plan for the torch area, and human resource cooperation.