The boiler installation for the Hehai New Energy Lanzhou Clean and Smart Heat Source Project has been completed, with the boiler itself now installed

2026-01-23View Original

Thread Content

On January 16, the boiler unit of the HHE New Energy Lanzhou Clean and Smart Heat Source Project was precisely hoisted into place on its tightly sealed roof, marking the complete installation of the boiler itself in the project. The key component of this lifting operation is the tightly sealed roof for the 30-ton boiler unit, which was prefabricated on the ground. Given the large size of the components and the high lifting heights involved, the project team made comprehensive plans: a 300-ton truck crane was selected as the main lifting equipment, and by taking advantage of the compatibility of the equipment available on site, an innovative construction method of \"prefabrication on the ground + installation in the air\" was adopted. The construction team divided the entire roof into east and west sections to carry out prefabrication in stages and lifting step by step. The roof structure features a pitched design on both the front and rear sides; it is 27.8 meters deep and 18.4 meters wide, with a slope of 10%. Galvanized steel gutters are installed on both the front and rear sides. The work area is adjacent to the boiler steel frame and the coal storage pit, resulting in complex site conditions. To ensure lifting precision and safety, the team employed a \"ground-to-air\" relay positioning method, completing the adjustment of the roof unit’s position in the air in just 15 minutes, thereby achieving a high precision standard with a placement error of ≤40 millimeters. Through continuous and precise operations, the boiler’s enclosed roof was successfully positioned at the top of the boiler.
Reply #22026-01-23
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982–2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-24
【Ten Years of Rapid Development in Chemical Equipment】2974–2026: China Achieves Full Domestic Production in ABS Technology and Related Equipment https://bbs.hcbbs.com/thread-5711312-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #52026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiading, Jiangsu built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-01-25
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiading, Jiangsu built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-01-25
【Ten Years of Rapid Development in Chemical Processing Equipment】2984-2026: Domestic production and use of rotary valves, key components in aromatic adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-01-26
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: HCHBBS Chemical Forum)
Reply #102026-01-26
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112026-01-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】2960–2025: China’s largest single-scale project for zero discharge of high-salinity wastewater – The Phase I project for zero discharge treatment of high-salinity wastewater containing nickel, cobalt, and other heavy metals from Jinchuan https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.