HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Dongming Shenghai Chemical New Materials Co., Ltd.’s 300,000 tons/year UPC technology pilot project

2026-01-23View Original

Thread Content

300,000 tons/year UPC technology pilot project: Owner – Dongming Shenghai Chemical New Materials Co., Ltd.; Location – Dongming Petrochemical Industrial Park, Heze, Shandong; Investment amount – 11.07 billion yuan. Project progress: Civil construction in progress. Project overview: The world’s first industrial demonstration project for UPC technology, aiming to create a new approach for converting crude oil into olefins featuring \"short processes, high efficiency, low emissions, and high yields\". Key construction components: a 300,000-ton/year UPC test unit, a 100,000-ton/year butadiene extraction unit, 80,000/50,000-ton/year MTBE/butene-1 units, a 550,000-ton/year light aromatic hydrocarbon hydrogenation unit, and a 350,000-ton/year aromatic hydrocarbon extraction unit. Once the project reaches full capacity, it will account for over 30% of Dongming Petrochemical’s total revenue, helping to develop a chemical new materials industry chain in the region worth hundreds of billions of yuan; the annual revenue is expected to be around 15 billion yuan.
Reply #22026-01-23
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-01-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-01-24
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-01-25
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiading, Jiangsu builds the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which is then shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-01-25
【Ten Years of Rapid Development in Chemical Processing Equipment】2984-2026: Domestic production and use of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-26
【Ten Years of Rapid Development in Chemical Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #92026-01-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Forum (Hchuanliu hcbbs))
Reply #102026-01-26
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial-scale production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: HCBBS Chemical Forum)
Reply #112026-01-27
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.