Thread Content
Demonstration Project for Low-Carbon Reconstruction and Comprehensive Utilization of Aromatic Feedstocks
Owner: Fuhai (Dongying) Petrochemical Technology Co., Ltd.
Location: Dongying, Shandong
Investment amount: 31.8 billion yuan
Project progress: Procedures under approval
Project overview: The total land area of the project is 271.9 hectares, equivalent to 4,078.5 mu. It includes a new crude oil processing capacity of 15 million tons per year, as well as 15 million tons of atmospheric and vacuum distillation units (including light hydrocarbon recovery), 3 million tons of slurry-bed residue hydrocracking, 2.2 million tons of wax oil hydrogenation treatment, 2 million tons of wax oil catalytic cracking, 1 million tons of catalytic gasoline hydrogenation, 600,000 tons of catalytic product refining, 500,000 tons of catalytic LPG separation, 2.2 million tons of continuous reforming, 2 million tons of extraction and aromatic separation, 2 million tons of diesel hydrogenation upgrading, 3 million tons of diesel hydrocracking, 2.6 million tons of wax oil hydrocracking units, 100,000 tons of MTBE, 200,000 tons of alkylation, 4×100,000 tons of sulfur recovery, 100,000 standard cubic meters per hour of 1#PSA and 2#PSA units, 2 million tons of POX production, 120,000 tons of PPC production, 1.2 million tons of aviation fuel hydrogenation, 800,000 tons of C3/C4 separation, 200,000 tons of butanol, among other 22 process units, along with the associated utility systems and auxiliary facilities. Expected commissioning date: end of 2026
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2036, the first industrial control system for the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiangsu Qidong built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2984-2026: Domestic production and use of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: HCHBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))