Construction in progress at the 1.5 million tons/year aromatic compounds and refinery upgrading project

2026-04-17View Original

Thread Content

Entering the site of the 1.5 million tons per year aromatic compounds and refining facility renovation project, one sees cranes everywhere, sparks flying in the air, and the roar of machinery mixed with the whistles of supervisors creating an intense \"spring symphony\" of construction activity. As of March 31, 111 out of 249 units in the continuous reforming plants have been installed; all the key equipment such as reactors, regenerators, towers, and compressor units have been properly installed in place” ; The installation of \"Module 1\" – the steel structure for the main pipeline corridor in the extraction unit of the No. 2 Aromatic Compounds Complex – this 52-meter-long, 360-ton \"giant\" was lifted smoothly and placed in position with precision, marking a significant breakthrough in the modular construction of the project’s steel structures. These vivid images of construction are a reflection of the aromatic compounds project’s use of labor competitions to spark a full-scale construction boom in the first quarter. Following the overall strategy of \"finalizing design, accelerating procurement, speeding up construction, giving top priority to safety, striving for excellence in quality, and ensuring strong support,\" the project team worked hard to achieve results, moved forward with determination through practical actions, and made concerted efforts in six key areas, thus laying a solid foundation for meeting the high-standard goals related to machinery delivery by the end of the year.
Reply #22026-04-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-21
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-04-22
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose stations, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-04-22
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #62026-04-22
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.