HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Jiangxi Ruixianke New Materials Co., Ltd.’s production project with an annual capacity of 100,000 tons of chemical fibers, 10,000 tons of recycled fibers, 10,000 tons of recycled polymer materials, and 90,000 tons of recycled polyester materials

2026-03-10View Original

Thread Content

Project Name: Jiangxi Ruixianke New Materials Co., Ltd.’s project to produce 100,000 tons of chemical fiber recycled fibers, 10,000 tons of recycled polymer materials, and 90,000 tons of recycled polyester materials per year. Launch date: March 10, 2026. Location: Jiangxi Province. Industry/Project Type: Chemicals and pharmaceuticals/chemical raw materials and chemicals, chemical fibers/synthetic materials. Project owner: Jiangxi Ruixianke New Materials Co., Ltd. Total investment: 2,050 million yuan. Current progress: Public consultation on the environmental impact assessment. Construction location: Phoenix Park, Ji’an High-Tech Industrial Development Zone, Ji’an City, Jiangxi Province. Land area covered: 100.5475 mu. Upon completion, the production capacity will be 90,000 tons per year of recycled polyester materials, 10,000 tons per year of recycled polymer materials, and 100,000 tons per year of chemical fiber recycled fibers. Milestone: March 9, 2026 – Public consultation on the environmental impact assessment for the project to produce 100,000 tons of chemical fiber recycled fibers, 10,000 tons of recycled polymer materials, and 90,000 tons of recycled polyester materials per year
Reply #22026-03-10
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-10
【3D Process Flow】Summary Post--Reverse Micelle Extraction Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-03-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical Company. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-03-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestic demonstration production line for the fiberization of coal-based solid waste with a capacity of 10,000 tons was put into trial operation between 2033 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-03-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-03-16
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-03-16
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-16
What specific material, PBAT or PLA?
Reply #102026-03-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-03-19
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.