Thread Content
Project Name: Xinjiang Xianan Energy Co., Ltd. – 300,000 tons/year urea production project via comprehensive utilization of exhaust gases
Launch Date: March 10, 2026
Location: Xinjiang
Industry/Project Type: Chemicals and pharmaceuticals/Chemical raw materials and chemicals/Fertilizers
Project Owner: Xinjiang Xianan Energy Co., Ltd.
Total Investment: Unknown
Current Progress: Environmental impact assessment under public review
Construction Location: Erdaohu Industrial Park, Xinjiang Xinxing Economic and Technological Development Zone
Project Details: Using coke oven gas, purified gas, carbon monoxide-rich gas, hydrogen-rich exhaust gases, and converter gas as raw materials, the project will involve the construction of a 40,000 tons/year LNG plant, an 180,000 tons/year ammonia synthesis plant, a 300,000 tons/year urea plant, along with various supporting facilities. Progress milestone: March 9, 2026 – First public information disclosure regarding the environmental impact assessment for Xinjiang Xianan Energy Co., Ltd.’s project to produce 300,000 tons per year of urea through the comprehensive utilization of exhaust gases (Environmental Impact Assessment disclosure)
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Stations with a Water Outlet Height of Less than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】Summary Post--Anti-emulsion Extraction Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033–2026: China’s first 10,000-tonne-scale demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3034–2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology, in collaboration with chlor-alkali manufacturers, overcomes the challenge of recycling hydrogen chloride as a by-product. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 2039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))