HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

259 million yuan! SMEC Coking & Refractory, in partnership with Wuyi Group and other consortia, won the bid for the EPC project for the overhaul of 6-meter coke ovens

2026-03-20View Original

Thread Content

259 million yuan! MCC Coking & Refractory, in partnership with Wuyi Group and other consortium members, won the bid for the EPC project related to the major renovation of 6-meter coke ovens. It was recently announced the results of the bidding process for the EPC general contracting of this project to renovate the 6-meter coke ovens at the coking plant on site. Name of the tendered project or bid section: On-site major renovation project for 6-meter coke ovens in the coking plant ; Construction location: Within the Liugang Steel Plant area in Loudi ; Winning bidder: Wuyi Group Shanghai Co., Ltd. (including the consortium: MCC Coking & Refractory (Dalian) Engineering Technology Co., Ltd. and Hunan Liangang Construction Co., Ltd.) Winning bid price: 258,890,000 yuan. Basic details of the project: The project involves overhauling the existing 6-meter coke ovens and their associated equipment and pipelines (including the oven structures and process facilities), as well as upgrading the waste gas treatment systems. It also includes establishing a raw coal transportation route from the silos to the new Coal No. 7 belt system, adding an automatic control system for the unloading carts and a remote operation system for the stacker-reclaimer. Dust cleaning towers and super centrifuges will be installed, and the No. 1 and No. 3 desulfurization towers will be upgraded. The fixed guides for the elevators in the quenching system, the steel structure of the elevator shafts, the insulation panels on the walkways, as well as the pipes for energy carriers, water-cooling sleeves, and related steel structures will all be replaced. Additionally, the external electrical wiring, coal gas pipelines, and other pipelines for energy carriers will be upgraded. Timeline requirement: 600 days (calendar days, the same below); planned start date: 2026-03-10; planned completion date: 2027-10-31. Scope of the bidding: I. Reform of the coking system: 1. Lining of coking oven refractory materials (including the canopy and oven drying systems). 2. Construction of coking ovens, control panels, track foundations, relocation of the No. 2 pit wall, etc. 3. Four major types of vehicles used in coking ovens, hydraulic switches. 4. Monotonic control system. 5. Systems for handling raw gas and waste gases, as well as iron components and furnace doors. 6. Process pipelines and steel structures. 7. Electrical systems, instruments, and ventilation systems for coking ovens. 8. Dust removal systems for coking ovens: systems for collecting smoke from the side of the furnace head and for removing dust during coke extraction. 9. Rising pipe ignition and venting device 10. Telecommunications and control room II. Gas purification system renovation: 1. Renovation of the condensation and blower system; 2. Replacement of the raw gas pipes, valves, and operation platforms in the area from the furnace front corridor to the gas-liquid separator. 3. Renovation and replacement of negative-pressure coal gas pipelines ; 4. Renovation of ammonia pipeline and associated facilities. III. External wiring modifications: 1. Power external wiring: (1) Modifications to the electrical external wiring required for new electrical equipment in the coke ovens, as well as for waste heat recovery systems in the rising pipes. (2) Power supply and control of equipment such as electrical valves on the external lines. (3) Addition of electrical external line renovation for the transformer room. 2. External pipeline of gas pipeline: (1) Gas pipes spanning the main road, high and low pressure ammonia pipes, and associated valves. The gas intake branch pipe, in conjunction with the coke oven rising pipe monolithic system, is equipped with an electro-hydraulic gas collection pipe pressure control valve (controlled by 4–20 mA.DC, with a 4–20 mA.DC valve position feedback unit) and an electric maintenance butterfly valve; the signals from these devices are fed into the coke oven control system for automatic control. (2) Redesign of the blast furnace gas pipeline in the regasification plant: the gas enters the coke oven from the machine side of the coke oven. The main blast furnace gas pipe has a diameter of DN1800; at the tapping point, there are tapping gate valves, electric blind valves, and electric butterfly valves. Each coke oven is equipped with a blast furnace gas pipe of DN1400, and an electric control valve is installed on the pipe that leads into the coke oven. (3) Replacement of the coke oven gas pipeline for reprocessing; electric blind valves and electric butterfly valves are installed at the gas extraction end. 3. Other energy medium external pipeline systems: compression pipelines at the coke oven end, as well as pipelines for nitrogen, steam, oxygen, fire-fighting water, production water, and domestic water. These pipelines are to be upgraded simultaneously along with the coal gas pipelines for returning coal to the furnace and those for blast furnaces, including the pipe galleries that cross the main roads.
Reply #22026-03-20
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first large-scale TO+RTO combustion unit independently designed by the Beijing Aerospace Power Research Institute has been operating at full capacity since 2044–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42026-03-22
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-03-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically developed third-generation nuclear power steam release isolation valve for the \"Hualong One\" reactor, model 3045-2026, has been officially shipped. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716068 (Source: Haichuan Chemical Engineering Forum (Hcbbs))
Reply #62026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-03-24
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial plant for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Haicun Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-03-27
【Ten Years of Rapid Development in Chemical Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system was approved for use, 3051–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.