Installation of the main body of the cold box for hydrogen production and SNG co-generation using coke oven gas from Hebei Fengmei Coking Plant is complete

2026-03-23View Original

Thread Content

The main structure of the cryogenic nitrogen production unit for the coke oven gas hydrogen production and SNG co-generation project at Hebei Fengmei Coking Co., Ltd. has been installed. According to a report from Saiding Company in March 2026, the installation of this main structure was successfully completed, which accelerates the progress of this project. The coker gas to hydrogen with co-production of SNG project at Fengmei Coking Company involves converting the existing methanol production facility, which has an annual capacity of 200,000 tons, for another purpose. Using coke oven gas as raw material, and leveraging the wet desulfurization process, gas holders, coke oven gas compression, and advanced desulfurization units of the methanol plant, new processes such as shift reaction, decarburization, membrane separation for drying, and compression are employed to produce natural gas products. The hydrogen is transported via pipelines to the urban gas network, while the excess hydrogen is fed into the existing 80,000-ton synthetic ammonia plant; as a result, an annual production volume of 140 million cubic meters of natural gas and 80,000 tons of synthetic ammonia will be achieved, with an annual output value of 308 million yuan.
Reply #22026-03-23
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-03-24
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial plant for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process was put into commission at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
Reply #42026-03-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #52026-03-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #62026-03-25
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: 15 years in total! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into production. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Haimen Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-03-27
【Ten Years of Rapid Development in Chemical Equipment】Key dehydrogenation technologies for the toluene-methylcyclohexane organic liquid hydrogen storage system were approved for use from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-03-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-03-29
【Common Issues in Haichuan Pipeline Design】--How to open and maintain valves that are crowded together? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716525 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-class CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating steadily for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-03-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Completion of China’s first self-developed 1500kN intelligent positioning winch system integration, 3055–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716494 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.