Thread Content
Invest 32 billion! The first phase of the project integrating wind and solar power with biomass to produce green alcohol and oil by China Energy Engineering Group has been approved. On December 8, information published on the Liaoning Province Online Approval and Supervision Platform for Investment Projects indicated that the “100,000-ton green methanol production project as part of the demonstration project in Shenyang that combines wind, solar power, and biomass to produce green alcohol and oil” has been approved for registration. Relevant information indicates that the project is located in Kangping County, Shenyang City, with an intended investment amount of 32 billion yuan. Phase 1 (2025–2027): Focused on the production of green methanol, with an investment of around 6.4 billion yuan to build a production line with an annual capacity of 100,000 tons. This facility will be equipped with 500,000 kilowatts of wind power capacity, and it will consume approximately 600,000 tons of biomass per year (such as straw and forestry waste). Phase 2 (2028–2030): Expand production capacity to 400,000 tons per year of green aviation fuel; add 1.5 million kilowatts of wind power capacity. The annual demand for biomass will reach 2.4 million tons, which is equivalent to 80% of the agricultural waste generated across Shenyang city.
【Ten Years of Rapid Development in Chemical Equipment】From 2025 to 2035, Pingmei Shenma Hydrogen Chemistry Company successfully achieved the domestic substitution of spare parts for high-pressure coal slurry pumps used in gasification units. https://bbs.hcbbs.com/thread-5707406-1-1.html (Source: Hchbbs Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】From 2886 to 2025: China’s first industrial production project using its own technology for adiponitrile via the butadiene process – Tianchen Qixiang New Materials’ 200,000-ton/year adiponitrile production facility has reached full capacity. https://bbs.hcbbs.com/thread-5707419-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2888-2025: Dongfang Electric’s floating wind power hydrogen production platform receives the world’s first approval certificate https://bbs.hcbbs.com/thread-5707552-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))