The LNG production project involving the resource utilization of exhaust gases from the Fischer-Tropsch synthesis process in Ningxia Coal Industry’s coal indirect liquefaction operation has entered the equipment installation phase; completion is scheduled for August 30

2026-04-07View Original

Thread Content

According to State Energy Group Ningxia Coal Industry, on the afternoon of March 28, 2026, with the last bucket of concrete poured into its place and the pouring process completed, the main structure of the 35kV substation for the technological development and industrial demonstration project aimed at utilizing the exhaust gases from coal indirect liquefaction via FTO synthesis to produce LNG was successfully completed. Thus, the main structural frameworks of all buildings in the LNG project have been completed, marking the full entry of the project into the installation phase and representing a significant step forward in its construction. The LNG project is scheduled to be handed over on 8/30. The LNG production project of Ningxia Coal Group, which involves the indirect liquefaction of coal through Fischer-Tropsch synthesis using the exhaust gases from this process, primarily utilizes deep cryogenic separation to isolate the non-permeable gases present in those exhaust gases, thereby producing LNG with high added value. This approach enables the coal-to-oil project to increase LNG production by 169,300 tons per year and LPG production by 47,200 tons per year; meanwhile, by-products such as hydrogen-rich gas, mixed hydrocarbons, and fuel gas are also generated. Additionally, the coal-to-oil system can reduce carbon emissions by 200,000 tons per year. By producing LNG from Fertile Synthesis exhaust gases, the structure of coal-to-oil products is transformed from pure oil derivatives to a combination of oil derivatives and clean energy in the form of LNG, thereby achieving technological upgrades in the co-production of oil and gas from coal and promoting the high-quality development of indirect coal liquefaction technology.
Reply #22026-04-07
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The distance between building smoke exhaust outlets is not set in accordance with requirements https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717214 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-07
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The pneumatic valve’s air supply line not sealed with a seal https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717224 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-07
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Lack of Test Records for Lightning and Static Protection in Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717229 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-07
Have you seen a cooling tower with air ducts? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717127 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-04-08
【Ten Years of Rapid Development in Chemical Equipment】China’s first and largest production line capable of producing 10,000 tons per year of polyhydroxyalkanoates (PHA) was built between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717057 (Source: Hachuan Chemical Industry Forum (Hcbbs))
Reply #72026-04-08
【Ten Years of Rapid Development in Chemical Equipment】China’s first and largest production line capable of producing 10,000 tons per year of polyhydroxyalkanoates (PHA) was built between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717057 (Source: Hachuan Chemical Industry Forum (Hcbbs))
Reply #82026-04-08
【Haichuan Equipment Guessing Game】What equipment is this being cleaned? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717350 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #92026-04-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】3069–2026: The Aerospace Long March and Inner Mongolia Baofeng’s construction of China’s first cluster of electrolytic hydrogen production facilities installed outdoors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717373 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-04-09
【Haichuan Equipment Guessing Game】What kind of equipment is this, and what task does it perform? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717374 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112026-04-09
【HaiChuan Equipment Guessing Game】A whole bunch of iron balls https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717129 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.