Thread Content
Recently, the pouring of the LNG tank foundation for the Dongying natural gas storage tank project, undertaken by the Tianjin branch of China National Chemical Engineering Corporation’s 13th Construction Company, was successfully completed. The LNG storage tank foundation for this project has a diameter of 52.6 meters and a height of 5.4 meters; it is composed of a lower foundation, intermediate short columns, and an upper foundation. The total volume of concrete used is 5,802 cubic meters, while the total weight of steel bars used is 1,124 tons. To ensure the successful completion of this pouring operation, the project team prepared a specialized construction plan for concrete pouring in advance, organized an expert review meeting on the specialized construction plan for the high-rise formwork support system, and provided thorough and detailed technical instructions to the construction workers. During the construction process, the project team organized inspections of key procedures such as steel bar binding, formwork installation, support system setup, and concrete pouring, to ensure that the quality of work at each stage met the specified standards. Project managers are present throughout the process to supervise and promptly coordinate the resolution of on-site issues. All the construction workers worked continuously and efficiently, and ultimately completed the pouring task successfully before the cold wave arrived. The successful completion of this pouring has laid a solid foundation for the subsequent construction tasks. The project team will seize this opportunity, strictly adhere to safety standards and maintain high quality control, and with a proactive and determined attitude, contribute to the company’s sustained high-quality development.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first nationwide test of ammonia-fueled operation of marine low-speed engines under all operating conditions was carried out in Qingdao from 2925 to 2025. https://bbs.hcbbs.com/thread-5709443-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHIHE Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Industry Forum (Hcbbs))