Thread Content
Recently, for the energy-saving optimization project of the aromatic compounds plant at Fujian Fuhai Chuang Petrochemical Co., Ltd.’s Tenglong Aromatic Compounds (Zhangzhou) Co., Ltd., which was undertaken under EPC contract by Beijing Petrochemical Engineering Co., Ltd. (referred to as \"Beiyou Engineering\"), the main structure of CS11 substation has been fully completed, laying a crucial foundation for the subsequent installation and commissioning of electrical equipment. This substation features a two-story frame structure: the first floor serves as a cable compartment, while electrical equipment is installed on the second floor. It provides a stable power supply for the core equipment used in the system upgrades, and acts as a crucial element in ensuring the reliable operation of the project’s power supply system. At present, the building decoration work for the project has been fully launched, with completion of the accompanying decorations scheduled for April, to ensure that electrical installation and commissioning tasks can proceed as planned. At present, the detailed design of the project has been fully completed, the procurement of key materials has been successfully carried out, and production scheduling for the manufacturing phase is in full progress ; The on-site civil construction has entered a critical phase; work is being carried out simultaneously at multiple locations, with safety-related tasks being completed one after another. The installation work has also begun, and the overall progress is in line with the planned schedule, remaining orderly and under control. Since the project was launched, Beiyou Engineering has leveraged the company’s overall resources, assigning a core team to oversee the entire process of design, procurement, and construction. By using 3D models for review, the construction process has been optimized to ensure the project progresses efficiently. Aligned with the **\"dual carbon\" strategic plan, this project is a key supporting initiative for the high-quality development of the Fujian Gulei Sino-Saudi Ethylene Project within the Gulei Petrochemical Complex. Upon completion of the renovation, the capacity structure of the aromatic compounds complex will be optimized, raw material adaptability will be improved, and energy consumption and carbon emissions per unit of product will be significantly reduced.
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Using the Chains of a Manual Winch to Directly Tie Up Loads https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717305 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Using the Chains of a Manual Winch to Directly Tie Up Loads https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717305 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Equipment Guessing Game】What equipment is this being cleaned? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717350 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, Changqing Oilfield developed China’s first \"integrated automated welding system for oil and gas field pipelines\". https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717357 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Equipment Guessing Game】What kind of equipment is this, and what task does it perform? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717374 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us -- Failure of Seals on Casing Used for Pipeline Passage Through Fire Dams https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717423 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, SHENGU Group successfully developed the world’s first reciprocating compressor with an ultra-high thrust of 2000 kN! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717432 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haimen Chemical Industry Forum (HCBBS))