Thread Content
On the 13th of the month, the Jingzhou Development and Reform Commission approved the request for an energy efficiency assessment regarding the project aimed at making comprehensive use of fluorine resources generated as a by-product of phosphorus chemical manufacturing, as well as expanding the related industrial chain. The details of the project are as follows: Image. Project name: Comprehensive Utilization of Fluorine Resources from Phosphorus Chemical Manufacturing by-Products and Expansion of the Related Industrial Chain; Construction unit: Hubei Fluori Chemical Co., Ltd ; Construction location: Lingang Industrial Park, Songzi City ; Project investment: 110 million yuan ; Project nature: New construction ; Construction period: Construction will begin in April 2026, with operation starting in December 2026. Scope of construction: The project will use the fluorosilicic acid method to produce aluminum fluoride, with a designed annual production capacity of 30,000 tons. The project covers an area of 8 mu, and the construction includes production facilities and a control room, covering a total building area of 5,349.12 square meters; one set of high-purity aluminum fluoride production equipment will be installed. Using fluorosilicic acid and aluminum hydroxide, which are by-products of the wet phosphoric acid production process from phosphate rocks, aluminum fluoride is produced, thereby extending the industrial chain while enabling the reuse and improved utilization of fluorine resources. Regarding Hubei Fluori Chemical Co., Ltd.: Hubei Fluori Chemical Co., Ltd. was established on July 11, 2025, with a registered capital of 30 million yuan. It is located in the Lingang Industrial Park, Lexiang Sub-district, Songzi City, Jingzhou Province, Hubei Province. Its industry belongs to the manufacturing of chemical raw materials and chemical products, and it is part of the Stanley Group.
[History of Haichuan Chemical] Compilation post -- Observing its development through history! Constantly being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[HaiChuan Safety Forum] Hidden hazards around us – The air supply for automated instruments is connected directly to the instruments without being filtered or pressure-reduced. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemical Engineering Forum (HCBBS))
[Common issues in Haichuan pipeline design] Selection of hoses and valves for utility material hose stations, as well as piping and installation details. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening – 8.6-meter molten salt tank-type collector systems and related processes have completed their technical validation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an international leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】 The pilot plant for the bio-based furandicarboxylic acid technology developed by the Dalian Institute of Chemical Physics, 3093-2026, has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718433 (Source: Haichuan Chemical Forum (HCBBS))