HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The brine storage tank for the Gansu Juhua project has been successfully hoisted into place

2026-04-21View Original

Thread Content

Recently, the brine storage tank for the Gansu Juhua project, constructed by the Xinjiang branch, was successfully hoisted into place. The installation work for this project has achieved phased progress, laying a solid foundation for subsequent construction efforts as the team strives to meet the \"double half\" targets.
Reply #22026-04-21
【In-depth Discussion on Modular Installation of Haichuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-21
【Ten Years of Rapid Development in Chemical Equipment】3082-2026 to Fill the Gaps. The first-phase project of Zhonghua Chemical West New Materials, with a capacity of 50,000 tons per year for the production of ultra-high molecular weight polyethylene, completed its trial operation with a successful first batch of material feeding. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717659 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #42026-04-22
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose station, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-04-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening size – 8.6 meters: Technical validation completed for complete sets of molten salt tank-type heat collectors and related processes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
Reply #62026-04-22
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-04-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “high-efficiency hydrogen production and hydrogenation integrated unit” technology developed by Dalian Institute of Chemical Physics from 2031 to 2026 passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718315 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-04-23
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an internationally leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-23
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an internationally leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102026-04-24
【Ten Years of Rapid Development in Chemical Equipment】3094-2026: Filling the Gap! Breakthrough achieved in China’s large-scale production technology for high-end oxalates https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718443 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #112026-04-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 3095 to 2026! China’s hydrogen pipeline project secures first order in Europe https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718447 (Source: HCBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.