Thread Content
At 11 a.m. on May 23, T201, the reformate fractionation tower of the aromatic compounds complex – the core unit of Sinopec Jiujiang Branch’s 1.5 million tons per year aromatic compounds production project – was successfully installed. This marks the successful completion, after more than 5 months, of the installation work for the six super-large towers in this facility. Tower T201 is the core equipment of the plant and is crucial for the project’s commissioning and operation. The tower is 67 meters tall and weighs 470 tons; it is large in size with a high center of gravity, making it susceptible to wind forces. This results in significant challenges regarding lifting operations as well as safety risks. The various departments of the Jiujiang Petrochemical Project management team conducted preliminary discussions and analyses, continuously optimized the construction plans, and thoroughly checked for potential safety hazards. The personnel on site performed their respective duties in close cooperation, accurately completing each task and successfully overcoming the challenges associated with the construction. Since December 2025, the team has been focusing on the schedule milestones to advance the equipment lifting in an orderly manner. The completion of this lifting operation marks a significant breakthrough in the installation of the main equipment for the aromatics complex; the project has now entered a new phase focused on supplementary installations, pipeline laying, and mechanical and electrical commissioning. Next, the team will make use of the construction window period, adhere strictly to safety and quality standards, refine on-site management, and go all out to accelerate the project progress to ensure its early completion and commissioning.
【Ten Years of Rapid Development in Chemical Engineering Equipment】The estimated resource volume from 2038 to 2026 amounts to 10.5 billion tons; historic breakthroughs have been achieved in the exploration and development of shale oil with moderate to low maturity levels in China. https://bbs.hcbbs.com/thread-5721869-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
【In-depth Discussion on HaiChuan Modular Installation】--Modular lifting of the steel structure for large-scale dewatering tanks; all large-scale lifting operations for the Liaohé Petrochemical’s sealed coking removal project have been successfully completed! https://bbs.hcbbs.com/thread-5721906-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Chemical Valve Management】Series Posts–40,000 People Flee in California: A Faulty Valve Triggers a High-Risk Chemical Emergency Race Against Time https://bbs.hcbbs.com/thread-5721634-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The results of the world’s first pilot production line for ceramic industry ammonia-hydrogen zero-carbon combustion technology, under the project timeline 3139–2026, have been approved. https://bbs.hcbbs.com/thread-5721923-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed or Plastic-Plugged Extra Power Inlets for Explosion-Proof Electrical Equipment https://bbs.hcbbs.com/thread-5721992-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The successful lifting of the 4,000-ton unit for China’s first large-scale low-temperature methanol washing plant, which utilizes entirely domestic technology, was completed between 2035 and 2026. http://bbs.hcbbs.com/thread-5721597-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【History of Haichuan Chemical】--Overview of the themes for “Safety Month campaigns” since the founding of the People’s Republic of China https://bbs.hcbbs.com/thread-5722041-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in the Petrochemical Industry, Section 07: Instruments and Measurement Elements https://bbs.hcbbs.com/thread-5721270-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in the Petrochemical Industry, Part 02: Pipeline layout in pipe galleries https://bbs.hcbbs.com/thread-5721265-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in Petrochemical Industries, Part 05–Pipelines for Utility Systems https://bbs.hcbbs.com/thread-5721268-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))