Thread Content
The 25th National \"Safety Production Month\" in 2026: Everyone talks about safety, and everyone knows how to handle emergencies; identifying and addressing risks and hazards. -------------------------------------------------- Zeon Corporation has approved a major new investment in its GPI facilities at its Water Island plant in Kurashiki, Japan, with the aim of enhancing its competitiveness in its rapidly growing C5 chemicals business. The project will increase the production capacity of dicyclopentadiene (DCPD) by about 20%. DCPD is a key raw material for producing cycloolefin polymers (COP) and COP optical films, products that represent the core growth areas in Rayon’s product portfolio. Furthermore, DCPD is also crucial for other high-value-added applications, including reaction injection molding (RIM) composites, and it constitutes the strategic core of Rayon’s medium-term business plan “STAGE30”. The company stated that this capacity expansion aims to “ensure a stable supply of DCPD without increasing the production volume of raw materials for general chemicals, such as m-pentadiene,” while also improving its environmental performance. Ryoun emphasized that the new facility will “use components that have not been utilized before,” thereby helping to reduce carbon emissions. Of particular importance is that the company’s statement reads: “Compared to extracting raw materials from the C5 fraction, the new process is expected to reduce carbon dioxide (CO2) emissions more effectively, thereby contributing to the achievement of carbon neutrality.” ” The expansion project is scheduled to commence in the second half of fiscal year 2026, with completion targeted for September 2028.
【Ten Years of Rapid Development in Chemical Engineering Equipment】3162-2026: China’s first batch of independently developed intelligent welding robots for offshore flexible manufacturing put into use https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723518 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
【Ten Years of Great Development in Chemical Equipment】 The “Integrated CO2 Capture and Conversion Technology for Methane Synthesis” (3163-2026) has passed the evaluation of scientific and technological achievements by the China Petroleum and Chemical Industry Federation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723645 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】3164-2026: China National Petroleum Corporation’s first project – The 50,000-ton/year co-production project for 1-hexene and 1-octene at Daqing Petrochemical was successfully handed over. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723648 (Source: Haichuan Chemical Forum (HCBBS))
[History of Haichuan Chemical] -- The past and present of the world’s first sewage treatment plant -- From the Great Stink of London to an AI-native water treatment plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723785 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Ten Years of Great Development for Chemical Industry Equipment】From 3154 to 2026, it will reach international leading levels! “Evaluation of the achievements in “Key Technologies for Polymer Batch Supercritical Foaming and Its Green Industrial Application”! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722917 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Great Development in Chemical Engineering Equipment】 The performance evaluation for the “Application Project of Ultra-Low Calorific Value Gas and Ultra-Enthalpy Combustion Technology using Aerospace Power Sources from 3166 to 2026” has been successfully completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723765 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Great Development in Chemical Equipment】 The world’s largest single-train ethylene plant with a capacity of 1.8 million tons per year, numbered 3167-2026, has been successfully commissioned in Gulei! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723864 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
[History of Haichuan Chemical] -- In 2012, the first batch of qualified liquid chlorine products from Hebei Shenghua Chlor-Alkali Base was filled and shipped out. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724011 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
[History of Haichuan Chemical] -- In 2012, the first batch of qualified liquid chlorine products from Hebei Shenghua Chlor-Alkali Base was filled and shipped out. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724011 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))