Thread Content
Fujian Rongchuang High-Performance Materials Co., Ltd.’s project to produce 160,000 tons per year of digitalized, functional green fibers 2025-11-21 09:39·All the Way to the Sun Project name: Fujian Rongchuang High-Performance Materials Co., Ltd.’s project to produce 160,000 tons per year of digitalized, functional green fibers Date of first announcement: November 20, 2025 Location: Fujian Province Industry/project type: Chemicals and pharmaceuticals/Chemical fibers/Synthetic fibers Project owner: Fujian Rongchuang High-Performance Materials Co., Ltd. Total investment amount: 3,448 million yuan Current progress: The project has been registered for approval. Location of construction: Shimen’ao Industrial Park, Dongzhuang Town, Xiuyu District, Putian City, Fujian Province. Scope of construction: This project will incorporate advanced production equipment from abroad, along with supporting infrastructure such as roads, parking lots, storage areas, landscaping, environmental protection facilities, power supply and distribution systems, water supply and drainage systems, and fire protection measures. Once completed, it will be capable of producing 160,000 tons per year of PA6/PA66 fibers (FDY/POY/DTY/ATY/ACY). The land area is 720 mu, with a total construction area of 286,000 square meters. Progress milestone: November 19, 2025 – The project registration procedures have been completed. (Project Filing)
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2028 to 2025, Lanshi Group developed China’s first 90MPa ionic liquid hydrogen compressor, which completed 90MPa hydrogen circulation pressurization tests. https://bbs.hcbbs.com/thread-5705737-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Systems’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has officially come online in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))