Submission for approval of the Environmental Impact Assessment Report for the Green Carbon Reduction Integrated Project (Phase 1) of the Yulong Island Refining and Chemical Integration Project

2026-06-17View Original

Thread Content

In 2026, the 25th National \"Safety Production Month\" will focus on the importance of safety for everyone and the need for everyone to know how to respond in emergency situations, as well as on identifying and addressing potential risks and hazards. On June 5th, the environmental impact assessment report for the first phase of the green carbon-reduction integrated project of Yulong Island’s refining and chemical integration project at Shandong Yulong Petrochemical Co., Ltd. was made public prior to its submission for approval. On April 7, the draft environmental impact assessment report for the Green Carbon Reduction Integrated Project (Phase 1) of Yulong Island Petrochemical Integration Project (Phase 1) at Shandong Yulong Petrochemical Co., Ltd. was made public for comments. Project Name: Yulong Island Petrochemical Integration Project (Phase I) – Green Carbon Reduction Integration Project (Phase I)
Location: Shandong Yulong Petrochemical Industrial Park, within Site 2 of Shandong Yulong Petrochemical Co., Ltd.
Construction Content: Construction of a new methanol production facility, etc.; upon completion, it will enable an annual methanol production capacity of 550,000 tons. On April 3, Shandong Yulong Petrochemical officially released the latest updates on the project’s progress: the Yulong Island integrated refining and chemical processing project (Phase 1) has entered the final stage of commissioning. The key units have successively completed handover, individual unit tests, and joint tests, with full operational capacity expected to be achieved in the second quarter of 2026. This marks the imminent commencement of this privately-funded integrated refining and chemical processing project, which is the largest of its kind in China.
Reply #22026-06-17
【Common Issues in Haichuan Pipeline Design】--Failure to install shut-off valves at areas where flammable liquids are stored creates safety hazards. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723697 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #32026-06-17
【History of Haichuan Chemicals】--The past and present of the world’s first sewage treatment plant--From the terrible stench in London to AI-powered water treatment plants https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723785 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #42026-06-17
【Ten Years of Rapid Development in Chemical Equipment】Reaching international leading levels by 3154-2026! “Evaluation of the achievements in “Key Technologies for Polymer Batch Supercritical Foaming and Its Green Industrial Application”! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722917 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-06-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】The application project for the ultra-low calorific value gas super-heterogeneous combustion technology developed by Aerospace Power Source has successfully passed its performance assessments. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723765 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #62026-06-19
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #72026-06-20
【History of Haichuan Chemical】--In 2012, the first batch of qualified liquid chlorine products was produced and shipped from Hebei Shenghua Chlor-alkali Plant. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724011 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-06-21
[Haichuan’s Guide to Chemical Equipment] -- Liquid Ring Vacuum Pumps https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724058 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-06-21
【Safety Management and Standardization of Special Equipment】Illustrated Quick Reference Guide to Major Hazards in Special Equipment! On-site inspection allows for direct comparison, enabling immediate identification of high-risk factors. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724082 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #102026-06-22
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112026-06-22
【History of Haichuan Chemical】The past and present of China’s first water treatment plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724185 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.