Announcement on the off-grid hydrogen production and low-temperature liquefaction project of Hebei Hongmeng Hydrogen Energy Technology Co., Ltd., with a total investment of 3.49 billion yuan

2026-07-06View Original

Thread Content

In 2026, the 25th National \"Safety Production Month\" will focus on the importance of safety for everyone and the need for everyone to know how to respond in emergency situations, as well as on identifying and addressing potential risks and hazards. On July 1st, the National Construction Project Environmental Information Disclosure Platform published the first set of information regarding the demonstration project for the comprehensive utilization of hydrogen produced through off-grid hydrogen production methods by Hebei Hongmeng Hydrogen Energy Technology Co., Ltd. Constructor: Hebei Hongmeng Hydrogen Energy Technology Co., Ltd. Location of construction: Zhangji Town and Danqinghe Township, Kangbao County, Zhangjiakou City, Hebei Province. Scope of construction: This project involves the construction of a hydrogen production facility equipped with alkaline and PEM electrolyzers capable of producing 2,000 or 3,000 cubic meters of hydrogen per hour; the hydrogen production capacity will be 240,000 cubic meters per hour, resulting in an annual output of 140,000 tons of green hydrogen. A hydrogen liquefaction unit with a capacity of 30 tons per day will also be built, along with necessary infrastructure such as factories, roads, and power transmission lines. Public information shows that the demonstration project for the comprehensive utilization of hydrogen produced through off-grid methods via low-temperature liquefaction requires a total investment of 10.4 billion yuan. The project includes 6 power generation facilities with a total installed capacity of 1.2 million kilowatts (wind power projects), as well as hydrogen production plants. Among them, the total investment in the project for the comprehensive utilization of hydrogen produced through off-grid hydrogen production via low-temperature liquefaction is 3.49 billion yuan. Source: Hydrogen Cloud Chain
Reply #22026-07-07
【Ten Years of Rapid Development in Chemical Equipment】3183-2026: China’s First Large-Scale Project for the Extraction of Phenol from Coal Tar – Xinjiang Xuanli’s 100,000 tons/year green extraction project for tar phenol, undertaken by CCCC. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725540 (Source: Hachuan Chemical Industry Forum (HCBBS))
Reply #32026-07-07
【Common Issues in Haichuan Pipeline Design】-- The stem of the gate valve connecting the outlet pipeline and the inlet pipeline of the hydrogenation unit is installed facing downward. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725261 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.