HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shandong Hualu Hengsheng Chemical Co., Ltd. New Energy Platform Optimization Project

2026-07-07View Original

Thread Content

Project Name: Optimization Project of the New Energy Platform at Shandong Hualu Hengsheng Chemical Co., Ltd.
Launch Date: July 1, 2026
Region: Shandong
Industry/Project Type: Chemicals and Pharmaceuticals/Chemical Raw Materials and Chemical Products
Project Owner: Shandong Hualu Hengsheng Chemical Co., Ltd.
Total Investment: 1,394.03 million yuan
Current Progress: Project registration completed
Construction Location: Yunhe Sub-district Office, Dezhou City, Shandong Province
Construction Scope: The project involves the construction of a facility capable of producing 750,000 tons per year of dimethyl oxalate; Using dimethyl oxalate as raw material, and employing advanced catalytic decarboxylation technology, a 300,000-ton/year dimethyl carbonate production facility will be built ; Some environmental protection, safety, and utility facilities are constructed accordingly as supporting elements. Upon completion and commissioning, the plant will have an annual production capacity of 750,000 tons of dimethyl oxalate, 300,000 tons of dimethyl carbonate, with 32,000 tons of dimethyl carbonate generated as a by-product. The project process mainly includes an esterification unit, a DMO synthesis and separation unit, an esterification and carbonate ester distillation unit, a catalytic decarboxylation unit for dimethyl oxalate, and a dimethyl carbonate distillation and purification unit. Milestone: June 29, 2026 – Project filing is completed. (Project filing)
Reply #22026-07-07
【Ten Years of Great Development in Chemical Equipment】3183-2026: The first large-scale phenol extraction project from coal tar in China – the 100,000-ton/year green phenol extraction project from coal tar undertaken by Xinjiang Xuanli has been completed. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725540 (Source: Haichuan Chemical Forum (HCBBS))
Reply #32026-07-07
【Common Issues in Haichuan Pipeline Design】-- The stem of the gate valve connecting the outlet pipeline and the inlet pipeline of the hydrogenation unit is installed facing downward. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725261 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-07-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Failure to Use Explosion-Proof Wire Glands at the Connections of Power Cables in Explosion-Proof Areas https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725759 (Source: HaiChuan Chemicals Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.