HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

A question regarding the welding test plate of sphere tank 12337

2015-07-08View Original

Thread Content

Paragraph 7.3 of 12337-2014 states that each spherical tank shall provide 6 base metal welding test plates, whereas paragraph 8.9.1.1.3 specifies that 2 welding test pieces made by vertical welding and horizontal plus overhead welding should be prepared for each spherical tank. Are these two requirements contradictory?
Reply #22015-07-09
http://bbs.hcbbs.com/thread-1381287-1-1.html Hello, you may refer to this post; it also deals with the issue of spherical tank test specimens. You can take a look and see how many pieces are required according to the technical specifications You can also ask the designer and clarify your doubts. This is probably a question that all dry ball tanks have.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.