HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can the tracks of a manual hoist be welded under the utility tunnel beam?

2015-07-12View Original

Thread Content

Due to production needs, it is necessary to add manual hoists. As space is limited, we are considering welding the track beams under the crossbeams of the pipe gallery (assuming that the load capacity of the pipe gallery permits it). Is this a proper approach?
Reply #22015-07-12
Electrical appliances should be explosion-proof; there’s nothing wrong with that, as long as it doesn’t cause any problems.
Reply #32015-07-12
This is possible; I’ve seen many such cases in person.
Reply #42015-07-13
This is generally not done, after all, there are height requirements for the bottom of the duct tunnel. There is also the risk of leakage from corrosive substances. Explosion-proof electric hoists are expensive.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.