HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Design issues for the supports of horizontal equipment?

2015-07-12View Original

Thread Content

HG/T20549 states that \"for water coolers, if the inlet pipe is introduced directly from a buried pipe, the side where the cooler is fixed should be located on the side of the inlet pipe.\" ”What is the theory behind doing this, everyone?
Reply #22015-07-14
Since the water pipes come up from underground, movement in all directions is restricted. If the sliding end is placed here, the expansion and contraction of the equipment will be limited by the pipes. Conversely, if this stretching force is large, it causes lateral force damage to the pipeline.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.