Can the opening of the hydrogenation corrosion inhibitor addition tank be covered?

2015-07-13View Original

Thread Content

I would like to ask the expert: Our device’s corrosion inhibitor tank has an access opening at the top, covered by a lid – is this sufficient? The corrosion inhibitor is pumped into the tower top pipeline via the oil mixture.
Reply #22015-07-15
Should the oil be poured into the corrosion inhibitor tank first? If so, it cannot be left open; the top of the tank needs to be connected to the flare system piping along with a check valve. It’s also advisable to install a self-acting nitrogen filling line as well.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.