On the Importance of Confirming Signatures—the Importance of Bill Handling!

2015-07-15View Original

Thread Content

I. Date: April 26, 2015 II. Location: Unit building III. Participants: Fitter + Instrument technician + Departmental management staff = about 10 people IV. Cause: No maintenance work planned for the previous system; the system was maintained at a pressure of 2.5 Mpa; The temperature sensor for the radial bearings on the low-pressure side of the compressor’s high-pressure cylinder was damaged; a blacksmith removed the radial bearings and thrust bearings in order to inspect them and replace the sensor ; Unit at rest, without air, steam, oil, or power supply ; According to the maintenance plan, the process engineer organized the necessary process procedures: the pneumatic two-position valve at the compressor’s inlet was closed, but the manual shut-off valve (DN300, 600LB) located downstream of that two-position valve remained open. The instrument technician adjusted the pneumatic two-position valve at the compressor’s inlet. The maintenance work order was not signed off by the shift supervisor in the process department; the normal procedure should have been: process engineer – equipment technician – safety officer – process supervisor – equipment supervisor – shift supervisor in charge of processes – person who receives the work order – worker carrying out the work. By violating these procedures and opening this valve, gas immediately entered the compressor cylinder, causing it to start rotating from a stationary state at around 900 r/min ; VI. Sequence of events: Before the incident, 2 fitters were working on the top of the compressor cylinder; after the valve assemblies were removed, 2 more fitters simply secured the shaft. 4 instrument technicians were responsible for removing the signal wires from the edges, while the rest of the personnel provided assistance from the periphery ; The fitter who was coming down from the top of the cylinder block suddenly shouted that the compressor had started running; for a moment everyone was stunned... 7. Result: No injuries were reported, and there was no visible damage to the equipment; strict action will be taken. VIII. Reflection: Safety is no trivial matter; staying vigilant everywhere is a form of education ; Carefulness is an attitude, while diligence is a skill!
Reply #22015-07-16
Safety is no trivial matter, but it is sometimes easily overlooked.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.