One question per day; those who answer correctly receive 6 wealth points, while participants receive 2 wealth points; Question 257

2015-07-21View Original

Thread Content

Nitrogen evacuation analysis is performed before adding material. Although the nitrogen pressure is high, the acetylene content detected during this analysis remains high. The reason for this is: ( ) A. Leakage in the nitrogen evacuation valve B. Leakage in the evacuation valve C. Leakage in the flap valve of the upper storage bin D. Leakage in the flap valve of the lower storage bin. Answer: D
Reply #22015-07-21
Nitrogen evacuation analysis is performed before feeding material. Although the nitrogen pressure is high, the acetylene content in the nitrogen evacuation analysis remains very high. Reason: (D)
Reply #32015-07-21
I’ll guess an answer; I think it’s one of the three options, Abd
Reply #42015-07-22
Nitrogen evacuation analysis is performed before adding material. Although the nitrogen pressure is high, the acetylene content detected during this analysis remains high. The reason is: (D) A. Leakage in the nitrogen evacuation valve B. Leakage in the evacuation valve C. Leakage in the flap valve of the upper storage bin D. Leakage in the flap valve of the lower storage bin
Reply #52015-07-22
D. Leakage in the lower storage hopper flap valve, that is, leakage in the second hopper’s flap valve
Reply #62015-07-22
Nitrogen exclusion analysis is conducted before adding material; although the nitrogen pressure is high, the acetylene content detected during this analysis remains very high. The reason is: ( ) D. Leakage in the flap valve of the lower storage hopper
Reply #72015-07-22
Nitrogen evacuation analysis is performed before adding material. Although the nitrogen pressure is high, the acetylene content detected during this analysis remains high. Reasons: (D) A. Leakage in the nitrogen evacuation valve B. Leakage in the evacuation valve C. Leakage in the flap valve of the upper storage bin D. Leakage in the flap valve of the lower storage bin

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.