HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Question regarding product test samples

2015-08-06View Original

Thread Content

This post was last edited by Menghuan100 on 2015-8-6 at 18:15. I would like to ask the experts: Since chloromethane storage tanks contain highly hazardous materials, it is necessary to conduct product testing on the relevant components. There is a DN500 manhole on the equipment, and product testing is also required for this section as well. Where does this requirement come from, and why?
Reply #22015-08-07
Check whether the welding process for the manhole segment is the same as that of the Class A welds in the main structure; if it is not, adjustments need to be made.
Reply #32015-08-12
Thank you all for your advice; I’ve learned something. :)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.