Help: How should this be designed?

2015-08-26View Original

Thread Content

A workshop produces 60 different products, each requiring distinct raw materials and equipment. If the design is based on one particular product, only a small number of pieces of equipment are needed; the client has also specified the manufacturing process for just one product. Yet, they still want to have all the equipment installed there. How should this be done? . . Thank you.
Reply #22015-08-26
I was once involved in a catalyst project; there were n different types of materials, and the same equipment had to switch between these materials frequently, which made it very difficult to choose the appropriate equipment~
Reply #32015-08-26
The host only prepared food for 1 table, but 60 guests showed up – how are they supposed to eat? ? The answer is clear—this food is unedible! To clarify the situation, we ask the owner to choose another solution.
Reply #42015-08-26
The type mentioned by LZ is likely a small-scale multi-functional workshop, where most of the production equipment is shared among different processes, with additional equipment added as needed.
Reply #52015-08-26
Leave enough space; first arrange this product in the equipment, and arrange the other equipment according to the owner’s requirements. The owner will be responsible for installing the pipes in the future.
Reply #62015-08-26
Leave enough space; first arrange this product in the equipment, and arrange the other equipment according to the owner’s requirements. The owner will be responsible for installing the pipes in the future.
Reply #72015-08-26
It is possible to continue communicating with the client and ask them to provide the most complex manufacturing process, after which appropriate equipment can be designed accordingly. All the devices can also be installed, and with valve control, it’s sufficient to open the valves when needed. However, this will result in higher equipment investment, and the client’s approval should still be obtained
Reply #82015-08-26
If you have any questions, feel free to keep communicating; let’s all learn and improve together. QQ: 75658313
Reply #92015-08-26
There seems to be no universal solution; one can only consider processes that are similar. Utility systems and tanks can be minimized based on the production category. Of course, this requires someone who has a thorough understanding of all the processes in order to reduce the number of devices needed.
Reply #102015-08-27
A multi-compartment layout is recommended, and the workshop should be large. Moreover, the labeling of raw materials and their storage must be strictly managed. In short, this is a stupid design.
Reply #112015-08-27
A client like this wouldn’t even bother to deal with them; it’s impossible to do such a thing. After all, you give me just one set of tools, but expect me to create 60 sets of products – that’s simply not possible! The client is being wishful now; how is that possible! How much money for how much work,

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.