HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

One post per day on occupational health

2015-09-29View Original

Thread Content

The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they should be integrated with the main structure of the project ( ) ( ) ( ) and ( ). A design simultaneously B construct simultaneously C put into production simultaneously D use
Reply #22015-09-29
A designed simultaneously, B constructed simultaneously, C put into production simultaneously
Reply #32015-09-29
A, B, C, D. The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they should be constructed (designed simultaneously), put into use simultaneously with the main structure of the project.
Reply #42015-09-29
A, B, C, D. The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they should be constructed (designed simultaneously), put into use simultaneously with the main structure of the project
Reply #52015-09-29
The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they are related to the main structure of the project (A) (B) (C) and (D). A design simultaneously B construct simultaneously C put into production simultaneously D use
Reply #62015-09-29
A simultaneous design; B simultaneous construction ; C went into production at the same time ; D usage
Reply #72015-09-29
Design simultaneously, construct simultaneously, and put into production and use simultaneously
Reply #82015-09-29
ABC, simultaneous implementation of three aspects~~~~~~~~~~~~~~~~~
Reply #92015-09-29
A design simultaneously, B construct simultaneously, C put into production simultaneously, D be used – all required, the three simultaneities
Reply #102015-09-29
The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they should be integrated with the main components of the project (A) (B) (C) and (D). A design simultaneously B construct simultaneously C put into production simultaneously D use
Reply #112015-09-29
A, B, C, D. The costs associated with the installation of occupational disease prevention facilities for construction projects should be included in the project’s budget, and they should be constructed (designed simultaneously), put into use simultaneously with the main structure of the project.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.