【Daily Question】December 24, 2015 – Boiler Basics True/False Questions (Top 50 responders receive +3 wealth points; those who get it right earn an additional +3 to +8 wealth points)

2015-12-24View Original

Thread Content

This post was last edited by *anpangpang on 2015-12-25 at 17:27. The Mechanical Section has introduced the \"Question of the Day\" feature, which not only helps to foster an active atmosphere for technical discussions and guide the direction of such exchanges but also provides users with financial rewards, enabling them to experience various cool features. True or False: The location of the boiler blowdown valve interface does not necessarily have to be at the lowest point of the furnace drum and the header. (Incorrect) Please note: We will close this post after 24 hours, and at that time we will announce the best reply (the best assistance), as well as the answer and explanation. The competition for \"Active Experts and Weekly Stars\" in the Machinery section has begun: http://bbs.hcbbs.com/thread-1489069-1-1.html. A comprehensive guide to preventing equipment from freezing over winter: http://bbs.hcbbs.com/thread-1502793-1-1.html
Reply #22015-12-24
The location of the furnace drain valve interface does not have to be at the lowest point of the furnace drum and the header. (right)
Reply #32015-12-24
The location of the boiler blowdown valve interface does not have to be at the lowest point of the furnace drum and the header. ( Wrong )
Reply #42015-12-24
Error————–——–——–——–——–——––––––––
Reply #52015-12-24
The location of the boiler blowdown valve interface does not have to be at the lowest point of the furnace drum and the header. (right)
Reply #62015-12-24
True or False: The location of the boiler blowdown valve interface does not necessarily have to be at the lowest point of the furnace drum and the header. (√)
Reply #72015-12-24
The location of the boiler blowdown valve interface does not have to be at the lowest point of the furnace drum and the header. (Mistake)
Reply #82015-12-24
The location of the boiler blowdown valve interface does not have to be at the lowest point of the furnace drum and the header. (X)
Reply #92015-12-24
The location of the boiler blowdown valve interface does not have to be at the lowest point of the furnace drum and the header. ()Right
Reply #102015-12-24
True or False: The location of the boiler blowdown valve interface does not necessarily have to be at the lowest point of the furnace drum and the header. (√)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.