A steam condensation system in a certain device requires the installation of traps. Which of the following design concepts are incorrect? A. Install cut-off valves, inspection mirrors, or test mirrors for the steam trap’s operation. B. Steam traps can be used in series. C. A cut-off valve and a drain valve should be installed in front of the steam trap. D. Multiple devices can share the same steam trap. I have no idea what to choose; Tian Da’s writings on steam traps are very good. Are there any specific standards? Please give your advice
1. Check valves cannot be used in series; they can be used in parallel if necessary. 2. Multiple steam-using devices should not share a single drain to prevent short circuits.
Thank you, Qingyun. The Tianjin University textbook provides very little information on hydroscapers; where can I find the relevant knowledge? Is option C correct?
C is correct, BD is incorrect. Was question A marked wrong? For the condensed water recovery system, a shut-off valve, inspection mirror, or sight glass is installed after the trap. This is from the original text of the association’s document.
If you have designed a steam trap, then option C is actually standard for such traps.
I worship those amazing people; I’m used to seeing your profile picture
There are detailed instructions in HG20570 regarding the setup of steam traps; unfortunately, it’s too thick and I’m too lazy to bring it to the exam venue
If you want detailed information, you should first consult HG20570, as well as the relevant specifications for check valves; many piping manuals also cover this topic. It is also covered in the petrochemical design manual. There are plenty of books.
BD is clearly specified in both the association’s documents and the 20570 standard