HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20160406】

2016-04-12View Original

Thread Content

Participation reward: 2 Wealth. Reward for correct answer: 9 wealth. The design phase for building drawings with complex technical requirements is generally divided into ( ) A. Preliminary design phase B. Construction drawing design phase C. Technical design phase D. Final decision-making phase
Reply #22016-04-12
ABC~~~~~~~~~~~~~
Reply #32016-04-12
A. Preliminary design stage B. Construction drawing design stage C. Technical design stage
Reply #42016-04-12
The design phase for building drawings with complex technical requirements is generally divided into (C) A. Preliminary design phase B. Construction drawing design phase C. Technical design phase D. Final decision-making phase
Reply #52016-04-12
A. Preliminary design stage B. Construction drawing design stage; C. Technical design stage; D. Final decision stage
Reply #62016-04-12
A. Preliminary design stage B. Construction drawing design stage C. Technical design stage

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.