HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

caesae three-way input

2016-04-12View Original

Thread Content

This post was last edited by nydsg on 2016-4-12 at 20:45. When modeling a tee, after defining the TEE on the main pipe, how should the FROM and TO points be specified when adding the branch pipes, so as not to change the dimensions of the original main pipe? When I was entering the tee branch, the teacher
Reply #22016-04-13
Complete the main pipeline first, then proceed with the branches.
Reply #32016-04-13
\"from\" generally refers to another point, preferably one that is not part of the overall layout you have designed. If you’re not sure how many points to use, it’s better to choose a larger value to avoid overlapping points, as this could affect the piping arrangement; Just click on the from point and scroll down normally. The size of the branch pipes can also be set by oneself; it’s fine to keep the original pipe size unchanged if that’s what one wants
Reply #42016-04-13
Take a look at this post: http://bbs.hcbbs.com/thread-1013247-1-1.html
Reply #52016-04-13
Thank you, the problem is solved; many thanks!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.