HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Sealing issue of the liquid chlorine tank farm building

2016-05-06View Original

Thread Content

Safety inspections require that the liquid chlorine tank area be enclosed. Should the enclosure of the buildings in the liquid chlorine tank area be carried out in accordance with the \"HG/T 20698-2009 Code for Design of Heating, Ventilation and Air Conditioning in Chemical Industries\"? I’m very confused and would appreciate advice from everyone.
Reply #22016-05-21
Perhaps it's due to **quality requirements, theft prevention, having five pairs, and other considerations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.