HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Question 59, afternoon of the first day of the 2014 Chemistry Examination

2016-06-20View Original

Thread Content

Which of the following are not part of the work tasks during the preliminary design phase of professional basic engineering for chemical process systems? (A) Process Flow Diagram (PFD) (B) Piping and Instrumentation Diagram (PID) (C) Professional design specifications (D) Piping layout diagram. Which options should be selected?
Reply #22016-06-20
AD A is the work done before the preliminary design; D is certainly not either
Reply #32016-06-20
A is from the process engineering field, and D is in piping
Reply #42016-06-23
The correct answers should be A and D; A is completed by the chemical engineering department, while D is done during the construction drawing phase
Reply #52016-07-05
Confused – is it AD or CD?
Reply #62016-08-15
I still don’t understand. Could someone explain it again?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.