HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Process of liquid chlorine tank area

2016-06-23View Original

Thread Content

I would like to ask everyone: Is it necessary to install an inlet liquid interlock cut-off valve for storing liquid chlorine in a horizontal tank? Is it necessary to install leak collection facilities in the liquid chlorine tank area?
Reply #22016-06-23
Do outlets also need to be equipped with interlocked cut-offs?
Reply #32016-06-23
According to regulations, liquefied gases and **gases must be equipped with emergency shut-off valves. If there is no enclosed space, it is not convenient to install leakage collection facilities in the liquid chlorine storage area, as liquid chlorine vaporizes quickly and is difficult to collect. Perhaps only setting up an alkaline water spray will do. What we did was place the liquid chlorine cylinders indoors, and then use exhaust fans to draw them into an alkaline water absorption tower for treatment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.