HCBBS Forum (English)

Seek modified asphalt process

Thread Content

Seek modified asphalt process
Reply #22016-06-25
Personally, it seems to be a process of adding modifiers; there’s nothing mysterious about it. The key lies in the substances added and their proportions, as well as in figuring out how to ensure that these modifiers blend perfectly with the base asphalt. A series of experiments are needed to achieve this
Reply #32016-07-05
Introduction to the SBS-modified asphalt process: A certain amount of 70# or 90# asphalt is pumped into the reaction vessel; a colloid mill is started to create circulation within the vessel. Approximately 5% of the asphalt volume in terms of SBS (thermoplastic styrene-butadiene rubber) is gradually added, and the temperature is raised to 150–160°C. The mixture is kept at this temperature for about 2 hours, until the SBS is evenly dispersed throughout the asphalt. After that, the mixture is transferred to a holding tank, stabilizers are added, and the mixture is stirred while kept at the same temperature for about 4 hours before samples can be taken for analysis of the three key parameters. (Modified asphalt for highway surface layers)
Reply #42016-07-08
The standard answer! :) Considered the father of SBS-modified asphalt and waste rubber-modified asphalt.

Submit a Project

Need technical support or have a project requirement? No registration needed.

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.