I would like to ask about the methods for purging and replacing the flare system

2016-07-11View Original

Thread Content

Our company’s torch system requires welding work; there are 61 branch pipes with a main pipe diameter of 350, and the tallest vertical pipe is 50 meters high. Could you advise on how to ensure thorough purging and replacement of the air from the system?
Reply #22016-07-11
Steam purging; steam visible at the torch top, for more than 24 hours; Drain at each low point (take precautions) ; Test the explosion protection at each low point; stop the steam supply once it passes the test ; Nitrogen is introduced through openings when working with fire; once the first opening is opened, it is safe to work with fire at other locations as well.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.