Discussion on the issues of low, medium, and high pressure in the budget quotas for process pipelines

2016-09-17View Original

Thread Content

When determining the quota for pipes, corresponding sub-items of the appropriate pressure grade are selected based on the design pressure. I would like to ask: if the pipe is of low pressure, does that mean the fittings as well have to be of low pressure? Are flanges and valves classified by pressure rating in terms of pound ratings? Or should it be calculated based on the pipeline?
Reply #22016-09-17
It should be based on the pipes; pipe fittings belong to a certain category, and high-pressure valves require even stricter installation requirements
Reply #32016-09-17
I remember that the compilation on quota explanations for flanges stated that it should be calculated separately based on the pressure rating, but the audit said it should be calculated based on the pipeline, just as you were told?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.