Regarding instrument installation

2016-10-11View Original

Thread Content

When installing the instruments, do you pre-drill holes first while laying the pipes below? Should holes be made in the pipe after it has been installed, or beforehand? Making more holes will cause debris to accumulate inside the pipe. When using pre-drilled holes or tees, is the distance from the thermometer flange to the flange surface 150? How do I handle threaded connections? Vehicle threaded tube? Just one year into learning design, I was given a major project involving the on-site installation of process pipelines. . . . . . . I increasingly feel that what I’ve learned isn’t enough. I hope the experts here will kindly share their insights~!!~
Reply #22016-10-11
For those that are pre-treated in advance after prefabrication, the corresponding nozzles must be welded first; for those that do not require heat treatment, this step can be done either first or later, with the latter being more common.
Reply #32016-10-11
Determined based on the actual conditions on site
Reply #42016-10-11
Based on the on-site conditions, if the construction drawings are very detailed and the construction team is highly skilled, work can start right away; otherwise, given the general standards in China, it’s better to delay starting the work, otherwise you’ll find that it was done for no reason. . .
Reply #52016-10-12
What’s the quality of China National 11th Construction Engineering Group’s products? The drawings are all single-line diagrams, with each pipe shown. The location is very detailed
Reply #62016-10-12
It was determined based on the actual conditions on site; that’s quite right
Reply #72016-10-12
I was in contact with 2nd Chemical Construction and 10th Chemical Construction a long time ago. They are all very skilled at their work. It is prefabricated directly based on the single-line diagram, resulting in fewer welds on site. By then, the instrument nozzles had already been prefabricated. For instruments, there are specialized instrument tapered tube thread fittings, which are different from those used in process applications. This is a standard component available on the market.
Reply #82016-10-13
You need to know that in China, there are many cases of companies operating under false pretenses. Also, if the construction costs are low, it’s impossible to expect high quality from such work; it’s not recommended to start such projects yet.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.