What does c=0.8 mean in many P&ID diagrams?

Thread Content

rt
Reply #22016-10-18
Look, what is it marked on? Look carefully at the image on the home page; maybe there’s an explanation in one of the lines of text~
Reply #32016-10-19
This post was last edited by yjjpedp on 2016-10-19 08:17; it is assumed to be the design allowance for the pipe wall thickness, equal to the corrosion allowance plus the thinning allowance; Or C may also represent the weld coefficient. S = PD/(2t + P) + C
Reply #42016-11-03
The first thing that comes to mind is a welding coefficient of 0.8, but this is probably the minimum requirement
Reply #52017-01-07
It would be best to include a flowchart; are you referring to the proportional coefficient for the traffic values? A pipe slope is still required; if there is a slope, it’s a fairly large one
Reply #62017-01-07
If there is no image for the home page, just ask the engineering company; logically, an image should be available for the home page

Submit a Project

Need technical support or have a project requirement? No registration needed.

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.