HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Could everyone please help me check whether this valve installation is reasonable?

2017-08-11View Original

Thread Content

I would like to ask everyone: is the installation location of the check valve behind the pump appropriate? There was a discussion in the forum regarding the sequence of installing the gate valve and check valve after the pump; the general opinion was to install the check valve first, and in my process flow diagram I also prefer to install the check valve first. I hope to get answers from everyone; please provide your opinions along with the reasons behind them. I’m new to this industry and there are many things I don’t know; thank you all
Reply #22017-08-12
The standard piping setup includes an inlet valve, filter, drain valve, reducer, pump, outlet reducer, pressure gauge, check valve, drain valve, and outlet valve.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.