HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the elevation of process piping

2017-09-10View Original

Thread Content

The absolute elevation is 3.4 m. How deep should the pipes at EL 1.7 BOP and EL 3.8 BOP be buried?
Reply #22017-09-10
EL 1.7 BOP means that the elevation of the bottom of the pipe is 1.7; adding the outer diameter of the pipe gives the elevation of its top. The height from the top of the pipe to the ground surface represents the depth of burial of the pipe.
Reply #32017-09-10
I am very grateful for Chuanyou’s response. As for the EL 3.8 BOP, it refers to the elevation of buried pipes with sleeves; I think the value given in the design is incorrect
Reply #42017-09-10
BOP refers to the distance between the top of the pipe and the natural floor level.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.