When underground oil tanks are arranged in a pit-filled with sand configuration, to create the necessary conditions for the equipment and civil works, should buoyancy be taken into consideration?

2017-11-29View Original

Thread Content

When underground oil tanks are arranged in a pit-filled with sand configuration, to create the necessary conditions for the equipment and civil works, should buoyancy be taken into consideration?
Reply #22017-11-29
It must be taken into consideration; otherwise everything will end up supporting you
Reply #32017-12-04
If the pit is a cement tank, there’s no need to worry about it; the civil engineering work for constructing the cement tank has already taken that into account.
Reply #42017-12-04
As a process engineer, one only needs to specify that the structure should be buried, along with the depth at which it should be buried. Consideration of the remaining structure

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.