At the final stage of project construction, can pipeline and equipment pressure testing and leak checking be skipped, and production started directly with materials fed in? Testing and leak-checking the entire system is very troublesome; it’s a tedious and laborious task that yields little reward, and it’s also difficult to keep records of. How should one keep such records? Is pressure testing done for each pipeline individually, with records kept?
Responsibly speaking: No. Rushing the work during construction, the use of low-quality materials by unscrupulous suppliers (mainly gaskets), and the attitude of the workers (the main problem being insufficient bolts and inadequate tightening) can all cause leaks in the piping system. Even though you conduct pressure testing, using only nitrogen or compressed air depending on the circumstances, leaks will still occur everywhere once other materials are introduced for normal operation. But if you don’t try, even more mistakes will be made, which not only affects your company’s reputation but also results in a huge amount of work that needs to be redone. I am in charge of equipment management for the client side; without seeing firsthand the pressure testing carried out by the contractor and without seeing the relevant photos, I will not sign the completion acceptance form. Even in the early stages of construction, pressure testing requirements and clarifications are specified in the contract. How could you have such a strange and whimsical idea of not conducting pressure testing? .
The trial production procedures must include a pipeline pressure testing report; in recent years, inspections of these procedures have become more stringent, so it is still necessary to prepare such a report, as it is beneficial for the client
I’m very curious about how such an idea came about
Pressure testing and leak checking of equipment/pipelines are necessary, and it is both a requirement and a responsibility for individuals. The difficult times of the project have passed; don’t overlook this step at the end. The work is not difficult; it can be tested for air tightness, and for leaks using water or an appropriate medium. Only by doing this is it complete project management.
That is, the basic rules need to be followed
Are there standard regulations that require it to be done?
This post was last edited by Song Xiaoqiang on 2023-6-28 at 08:29. 1. The property owner, supervisors, and others all need to sign the documents; if they don’t do it, then no one will sign, I guess; 2. Even if it is done, there may be some hidden risks that go unnoticed; if it isn’t done, those risks will only increase. Aren’t you worried about accidents occurring during operation? 3. For pipeline pressure testing, it is necessary to prepare a pressure testing plan in advance, which should be formulated in accordance with the system requirements ;
What if a major accident occurs if we don’t conduct pressure testing? Your kind of thinking is very dangerous and unacceptable.
This cannot be taken lightly. In the case of pressure vessels or pressure pipelines, without undergoing pressure testing, the supervision and inspection authority will not issue a supervision report, and the construction unit will thus be unable to bring them into operation legally. Even if it is not a special type of equipment, in accordance with relevant standards and specifications such as SH3501 and GB50517 in the petrochemical industry, a system pressure test is still required; this is an important step to relieve the responsibilities of the construction party. Implementation is rather complicated; it is necessary to divide the pressure testing system in advance according to the manufacturing process, prepare the tools required for pressure testing. After welding, non-destructive testing, and heat treatment are completed, many blind flanges have to be added or removed, and temporary wiring has to be installed. For a device of several tens of thousands of inches in size, it takes about a month to complete the testing of its piping system, and there is also a risk of the pipelines being damaged due to freezing in winter. Only a small number of pipelines with low pressure and non-hazardous media can, in accordance with regulatory requirements, undergo pressure testing at the same time as the initial operation of the facility. In short, no matter how troublesome this step may be, it must not be skipped at all – the responsibility is significant!
Why work to earn money? It’s so tiring to work; isn’t it better to just wait for death at home? Is this the same principle?