Is it a problem if the drain point is too far ahead of the expansion bend in the steam pipeline?

2021-08-29View Original

Thread Content

The hydrophobic point is not installed near the expansion bend; it is still about 7-8 meters away. Will there be water hammer caused by the inability to drain condensate during actual operation?
Reply #22021-08-29
The water at the bend behind will definitely not be able to drain; I hope water hammer won’t occur
Reply #32021-09-02
Design institutes generally place the water drainage points at the start of the expansion bend, and install liquid collection containers at those locations. With your company’s approach, water may accumulate at the bend, leading to water hammer effects.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.